Certificates/Standards: | N; |
Monthly Output: | Not provided |
Regional: | Foushan |
Packaging Information: | Not provided |
Mode Of Payment: | Not provided |
Delivery Lead Time: | Not provided |
Main Sales Markets: | North America,Central/South America,Western Europe,Eastern Europe,Australasia,Asia,Middle East,Africa |
Sample Provided: | No |
Sample Policy: | Not provided |
Minimum Quantity: | Not provided |
OverviewQuick DetailsWarranty:
2 YearsApplication:
Food, Beverage, Medical, Chemical, Machinery & HardwarePackaging Material:
Plastic, Paper, Composite film, Laminated Film, Premade bagsType:
Multi-Function Packaging MachineApplicable Industries:
Manufacturing Plant, Machinery Repair Shops, Food & Beverage Factory, Farms, Retail, Food Shop, Printing Shops, Construction works , Food & Beverage ShopsCondition:
NewFunction:
Filling, Sealing, Feeding, bag Forming, OutputPackaging Type:
Cans, Stand-up Pouch, Bags, Film, Foil, Pouch, CaseAutomatic Grade:
AutomaticDriven Type:
PneumaticVoltage:
220V 50HzPlace of Origin:
Guangdong, ChinaBrand Name:
BAOPACKDimension(L*W*H):
L1500*W680*H11950mmCertification:
CE ISOAfter-sales Service Provided:
Free spare parts, Field installation, commissioning and training, Field maintenance and repair service, Video technical support, Online support, Engineers available to service machinery overseasCapacity:
60bags/minFilm width:
(L)50-200 (W) 50-150mmBag type:
Pillow-type bag, standing-bevel bag, punch bagMax film with:
Max.320Film Thickness:
0.04-0.09mAir consumptin:
0.8ps 0.25m3/minWeight:
250KGSupply AbilitySupply Ability:
100 Set/Sets per Month
Packaging & DeliveryPackaging Details
1> Stick safety stickers and fasten screws and clean, lubration, Rust-proof;
2> Dismantle into packing parts;
3> Wrap in plastic film tight;
4> Fix in Plywood Cases
5> Forklift into Containers
Suitable for long distance land and ocean transportation, we prefer you choose FCL for shipment, for safety loading & unloading to the destination.Port
Foshan, Guangzhou, Shenzhen
Lead Time :
Quantity(Sets) 1 - 1 2 - 5 >5 Est. Time(days) 30 50 To be negotiated