Certificates/Standards: | N; |
Monthly Output: | Not provided |
Regional: | Foushan |
Packaging Information: | Not provided |
Mode Of Payment: | Not provided |
Delivery Lead Time: | Not provided |
Main Sales Markets: | North America,Central/South America,Western Europe,Eastern Europe,Australasia,Asia,Middle East,Africa |
Sample Provided: | No |
Sample Policy: | Not provided |
Minimum Quantity: | Not provided |
OverviewQuick DetailsWarranty:
1 YearApplication:
Food, Beverage, Medical, Chemical, Machinery & HardwarePackaging Material:
Plastic, Paper, Composite film, Laminated Film, Premade bagsType:
Multi-Function Packaging MachineApplicable Industries:
Manufacturing Plant, Machinery Repair Shops, Food & Beverage Factory, Farms, Retail, Food Shop, Printing Shops, Construction works , Food & Beverage ShopsCondition:
NewFunction:
Filling, Sealing, Feeding, bag Forming, Output, BIOS(Basic Imput and Output SystemPackaging Type:
Cans, Stand-up Pouch, Bags, Film, Foil, Pouch, CaseAutomatic Grade:
AutomaticDriven Type:
PneumaticVoltage:
380V 50HZPlace of Origin:
Guangdong, ChinaBrand Name:
BAOPACKDimension(L*W*H):
L2040*W1430*H2010mmCertification:
CE ISOAfter-sales Service Provided:
Free spare parts, Field installation, commissioning and training, Field maintenance and repair service, Video technical support, Online supportCapacity:
45 Bags/minBag size:
(L)20-400mm (W)140-350mmMax packaging film width:
Max 730mmFilm thickness:
0.06-0.12mmAir consumption:
0.8Mpa 0.8m3/minPower Supply:
7.795KW 380V 50HZTotal height:
4.183mSupply AbilitySupply Ability:
100 Set/Sets per Month
Packaging & DeliveryPackaging Details
1> Stick safety stickers and fasten screws and clean, lubration, Rust-proof;
2> Dismantle into packing parts;
3> Wrap in plastic film tight;
4> Fix in Plywood Cases
5> Forklift into Containers
Suitable for long distance land and ocean transportation, we prefer you choose FCL for shipment, for safety loading & unloading to the destination.Port
Foshan, Guangzhou, Shenzhen
Lead Time :
Quantity(Sets) 1 - 1 2 - 5 >5 Est. Time(days) 35 50 To be negotiated